Niger Type Approval Summary
Niger is a small telecommunications market in West Africa with significant growth potential. The country’s mobile network operator (MNO) market is poised for continued growth.
This is driven by a young population that is fueling the adoption of mobile internet, digital services, and mobile money. With a land area of approximately 1.27 million km² and a population of about 29 million, Niger still faces challenges typical of African countries in general, namely infrastructure and domestic political dynamics.
For manufacturers and importers seeking to expand their global market presence, Niger is a market worth considering. Before marketing telecommunications devices in this country, the first thing to know is the applicable compliance requirements.
These compliance requirements are known as “ARCEP Homologation.” ARCEP stands for Autorité de Régulation des Communications Électroniques et de la Poste (Electronic Communications and Postal Regulatory Authority).
ARCEP is the authority responsible for regulating the postal and electronic communications sectors in Niger. In carrying out its duties, the authority monitors and enforces the obligations of the parties involved, oversees rates and service quality, supports the development of the regulated sector, and mediates disputes.
ARCEP homologation is part of the enforcement of requirements for manufacturers and importers who wish to market their telecommunications equipment in Niger. Without this certification, telecommunications products cannot be legally marketed or used in the country.
Applicant for Niger Type Approval
- Local representative
- Required
Applicants for homologation must be legal entities established in Niger. Therefore, foreign manufacturers must appoint a local representative to submit the application and provide a Letter of Authorization or Power of Attorney as part of the application package.
Application Method
- In-country testing
- No
- Paperwork only
- Yes
Generally, the recommended application method for homologation certification in Niger is paperwork or document evaluation. Local testing is not the recommended method for this process.
Before applying for certification, applicants should understand the requirements related to the application process. ARCEP has specific technical standards, testing laboratories, and submission document requirements.
Technical Standard
Equipment intended for distribution in Niger must meet the technical requirements established by the authorities. These requirements are based on international standards (such as ITU, IEC, IEEE, etc.). The following test parameters are required to meet these technical requirements:
- RF: EIRP, conducted power, spurious emissions, power spectral density, frequency stability, bandwidth, frequency error, receiver blocking, channel access, DFS, adjacent-channel power
- EMC: Electromagnetic emission testing and immunity to electromagnetic interference
- Electrical Safety: Dielectric/insulation, electrical continuity, residual voltage, power consumption, mechanical tests, fire tests, temperature rise
- Cybersecurity: Penetration testing, encryption, authentication, access control, firmware analysis, software update security
- Health: User health protection
- Interoperability: Device compatibility with networks and other devices
To facilitate foreign applicants, ARCEP also accepts certifications from the equipment’s country of origin, provided that the testing complies with international standards recognized by ARCEP.
The authority may also accept copies of homologation decisions issued by competent foreign authorities, particularly those issued in the equipment's country of origin. Applicants must also submit a Declaration of Conformity and applicable test reports as part of the application package.
Testing Laboratory
The testing laboratory used for testing must be accredited by a competent accreditation body. ARCEP will verify the accreditation status of the laboratory based on the information submitted as part of the application.
Submission Documents
The test report and certificate of conformity must be included with the application documents. All documents must be submitted directly to the authority’s office to file the application. ARCEP will verify the documents that have already been submitted to ensure the product meets the technical requirements.
Sample Requirements
For equipment connected to a public telecommunications network, the application must be accompanied by two representative samples. ARCEP may also request additional samples if the certificate issued in the country of origin does not correspond to the equipment being submitted or if the supporting documentation is insufficient to demonstrate compliance. All samples must be submitted directly to the authority as part of the application process.
Document Requirements
The application documents must be prepared in duplicate and consist of:
Administrative documents:
- A stamped letter of application addressed to the Director General of ARCEP.
- A completed and signed homologation application form.
- A letter of authorization from the manufacturer appointing a representative.
- Proof of payment of the certification fee.
Technical documents:
- A detailed technical datasheet.
- Test reports for EMC, spectrum usage, electrical safety, health and the environment, interoperability, network protection, and data protection.
- A certified copy of the homologation decision from the country of origin (if available).
Submission process
- Submission
- Offline
Applications for homologation are submitted by mail directly to the authority’s office at the following address: Direction Générale de l’ARCEP, Derrière 2ème Arrondissement Communal, Rue du Stade Général Seyni Kountché, BP 13 179, Niamey, Niger. If the application is incomplete, the regulator will request additional information electronically.
Lead Time for Niger Type Approval
- Lead time
- 2 months
Under applicable regulations, the authority must issue a homologation decision no later than two months after the issuance date of the application receipt, including the issuance of the certificate.
Validity Period
- Validity
- 3 years
The homologation certificate is valid for three years from the date of issuance and may be renewed. The renewal requirements are as follows:
- The application must be submitted at least two months before the expiration date.
- The applicant must demonstrate that the device has not undergone any substantial changes, and the mandatory annual monitoring report must be attached.
- ARCEP conducts a conformity assessment before issuing the renewal.
Label Requirements for Niger Type Approval
- Product label
- Required
- Approval mark
- Required
Under applicable regulations, the authorities require that approved devices be affixed with a permanent, non-removable label before they are marketed or used on Niger’s public networks.
The label must include:
- The type approval number.
- The date of type approval.
- The model identification.
- The lot number or serial number.
- The manufacturer’s or supplier’s identification.
However, the authorities do not provide a sample label or specify how it must be affixed.
Alternative Country Names
Republic of Niger, République du Niger, Republik Niger, Nigerië, Nigyɛ, Nigeri, Nícher, Níxer, Нігер, Pow Nijer, Niĝero, Nijeer, Nayjer, Nisia, Niiseer, النيجر, 尼日尔, ニジェール, 니제르, Нигер
Rules by Technology
Allowed, approval required
- Wi-Fi 2.4 GHz
- Wi-Fi 5 GHz
- Wi-Fi 6E (6 GHz)
- Wi-Fi 7
- Bluetooth Classic
- Bluetooth Low Energy
- NFC
- RFID
- UWB
- Zigbee
- Thread
- Z-Wave
- DECT
- 2G/3G
- 4G LTE
- 5G NR
- NB-IoT
- LTE-M
- LoRa / LoRaWAN
- Sigfox
- Automotive radar (77 GHz)
- Short-range radar (24 / 60 GHz)
- GNSS (GPS)
- Satellite communication
- Wireless charging (Qi)
- PMR / Walkie-talkie
- Amateur radio
- Passive Optical Network (PON)
- Wavelength Division Multiplexing (WDM)
- Coaxial Cable
- ISDN
- Ethernet
- VoIP
- IPv6
- Power Line Carrier
- Microwave Link
- Free Space Optics
- Digital Audio Broadcasting (DAB)
Talk to our project handler
Send your product details and we reply with the ARCEP requirements, lead time and cost.
Request a quote