Wavelength Division Multiplexing (WDM) Certification by Country

Carrying several optical signals on one fibre at different wavelengths, as in CWDM and DWDM.

Requirements by country

CountryAuthorityStatusConditionsLead timeRequirements
Egypt NTRA Allowed, approval required – Paperwork: 14 days. Local Testing 4-5 weeks. Requirements →
Hong Kong OFCA Allowed, approval required – 15 working days Requirements →
Japan MIC Allowed, approval required – 3–4 weeks Requirements →
South Korea RRA Allowed, approval required – About 8 weeks Requirements →
Saudi Arabia CST Allowed, approval required – About 2 weeks Requirements →
United Arab Emirates TDRA Allowed, approval required – 3-5 working days Requirements →
Yemen MTIT Allowed, approval required – 4–8 weeks Requirements →
Mexico CRT Allowed, approval required – NOM: 3-5 weeks. CRT: 20 business days. Requirements →
Australia ACMA Allowed, approval required – 5 business days Requirements →
Argentina ENACOM Allowed, approval required – 12-14 weeks Requirements →
Brazil ANATEL Allowed, approval required – 8–12 weeks Requirements →
India WPC ETA and TEC MTCTE Allowed, approval required – WPC ETA certification is around 1 to 2 weeks. TEC MTCTE certification takes around 8-12 weeks Requirements →
Brunei AITI Allowed, approval required – 2 weeks Requirements →
Cambodia TRC Allowed, approval required – 15 working days Requirements →
Indonesia DJID Allowed, approval required – Local Testing around 5 weeks and Paperwork is about 3-5 week. Requirements →
Laos MTC Allowed, approval required – Paperwork: 10 working days. Local Testing: Take several additional weeks Requirements →
Malaysia SIRIM Allowed, approval required – Paperwork about 2weeks. Local testing approximately 4 to 6 weeks. Requirements →
Philippines NTC Allowed, approval required – 20-25 business days Requirements →
Singapore IMDA Allowed, approval required – 3 days (M2M: 2–3 months) Requirements →
Thailand NBTC Allowed, approval required – 4–8 weeks Requirements →
Vietnam MoST Allowed, approval required – 5–6 weeks Requirements →