LPWAN Type Approval and Certification by Country

Low-power wide-area networks such as LoRaWAN and Sigfox for long-range, low-data IoT devices. Allowed with type approval in every country in the Narmadi registry.

Type approval required in ๐Ÿ‡ฉ๐Ÿ‡ฟ Algeria๐Ÿ‡ง๐Ÿ‡ผ Botswana๐Ÿ‡ง๐Ÿ‡ซ Burkina Faso๐Ÿ‡ง๐Ÿ‡ฎ Burundi๐Ÿ‡ช๐Ÿ‡ฌ Egypt๐Ÿ‡ฌ๐Ÿ‡ญ Ghana๐Ÿ‡ฒ๐Ÿ‡ท Mauritania๐Ÿ‡ฒ๐Ÿ‡บ Mauritius๐Ÿ‡ณ๐Ÿ‡ฆ Namibia๐Ÿ‡ณ๐Ÿ‡ฌ Nigeria๐Ÿ‡ท๐Ÿ‡ผ Rwanda๐Ÿ‡ธ๐Ÿ‡ฑ Sierra Leone๐Ÿ‡ฟ๐Ÿ‡ฆ South Africa๐Ÿ‡น๐Ÿ‡ฟ Tanzania๐Ÿ‡ฌ๐Ÿ‡ฒ The Gambia๐Ÿ‡น๐Ÿ‡ฌ Togo๐Ÿ‡บ๐Ÿ‡ฌ Uganda๐Ÿ‡ฟ๐Ÿ‡ฒ Zambia๐Ÿ‡ฟ๐Ÿ‡ผ Zimbabwe๐Ÿ‡จ๐Ÿ‡ผ Curaรงao๐Ÿ‡ฉ๐Ÿ‡ฒ Dominica๐Ÿ‡ญ๐Ÿ‡ณ Honduras๐Ÿ‡ฏ๐Ÿ‡ฒ Jamaica๐Ÿ‡ต๐Ÿ‡ฆ Panama๐Ÿ‡ฐ๐Ÿ‡ณ Saint Kitts and Nevis๐Ÿ‡ป๐Ÿ‡จ Saint Vincent and the Grenadines๐Ÿ‡ง๐Ÿ‡ธ The Bahamas๐Ÿ‡น๐Ÿ‡น Trinidad and Tobago๐Ÿ‡ญ๐Ÿ‡ฐ Hong Kong๐Ÿ‡ฏ๐Ÿ‡ต Japan๐Ÿ‡ฐ๐Ÿ‡ท South Korea๐Ÿ‡ง๐Ÿ‡ญ Bahrain๐Ÿ‡ฎ๐Ÿ‡ถ Iraq๐Ÿ‡ฐ๐Ÿ‡ผ Kuwait๐Ÿ‡ฑ๐Ÿ‡ง Lebanon๐Ÿ‡ด๐Ÿ‡ฒ Oman๐Ÿ‡ถ๐Ÿ‡ฆ Qatar๐Ÿ‡ธ๐Ÿ‡ฆ Saudi Arabia๐Ÿ‡ธ๐Ÿ‡พ Syria๐Ÿ‡ฆ๐Ÿ‡ช United Arab Emirates๐Ÿ‡พ๐Ÿ‡ช Yemen๐Ÿ‡ง๐Ÿ‡ฒ Bermuda๐Ÿ‡จ๐Ÿ‡ฆ Canada๐Ÿ‡ฒ๐Ÿ‡ฝ Mexico๐Ÿ‡ฆ๐Ÿ‡บ Australia๐Ÿ‡ซ๐Ÿ‡ฏ Fiji๐Ÿ‡ฐ๐Ÿ‡ฎ Kiribati๐Ÿ‡ณ๐Ÿ‡ท Nauru๐Ÿ‡ณ๐Ÿ‡ฟ New Zealand๐Ÿ‡ต๐Ÿ‡ฌ Papua New Guinea๐Ÿ‡ผ๐Ÿ‡ธ Samoa๐Ÿ‡น๐Ÿ‡ด Tonga๐Ÿ‡ป๐Ÿ‡บ Vanuatu๐Ÿ‡ฆ๐Ÿ‡ท Argentina๐Ÿ‡ง๐Ÿ‡ด Bolivia๐Ÿ‡ง๐Ÿ‡ท Brazil๐Ÿ‡จ๐Ÿ‡ด Colombia๐Ÿ‡ช๐Ÿ‡จ Ecuador๐Ÿ‡ฌ๐Ÿ‡พ Guyana๐Ÿ‡ต๐Ÿ‡พ Paraguay๐Ÿ‡ต๐Ÿ‡ช Peru๐Ÿ‡ฆ๐Ÿ‡ซ Afghanistan๐Ÿ‡ฎ๐Ÿ‡ณ India๐Ÿ‡ณ๐Ÿ‡ต Nepal๐Ÿ‡ฑ๐Ÿ‡ฐ Sri Lanka๐Ÿ‡ง๐Ÿ‡ณ Brunei๐Ÿ‡ฐ๐Ÿ‡ญ Cambodia๐Ÿ‡ฎ๐Ÿ‡ฉ Indonesia๐Ÿ‡ฑ๐Ÿ‡ฆ Laos๐Ÿ‡ฒ๐Ÿ‡พ Malaysia๐Ÿ‡ต๐Ÿ‡ญ Philippines๐Ÿ‡ธ๐Ÿ‡ฌ Singapore๐Ÿ‡น๐Ÿ‡ญ Thailand๐Ÿ‡ป๐Ÿ‡ณ Vietnam

Requirements by country

CountryAuthorityStatusLead timeRequirements
Algeria ARPCE Allowed, approval required 8 weeks Requirements โ†’
Botswana BOCRA Allowed, approval required 2-12 weeks Requirements โ†’
Burkina Faso ARCEP Allowed, approval required 2 months Requirements โ†’
Burundi ARCT Allowed, approval required 22 working days Requirements โ†’
Egypt NTRA Allowed, approval required Paperwork: 14 days. Local Testing 4-5 weeks. Requirements โ†’
Ghana NCA Allowed, approval required 15 days Requirements โ†’
Mauritania ARE Allowed, approval required 2 months Requirements โ†’
Mauritius ICTA Allowed, approval required 4 weeks Requirements โ†’
Namibia CRAN Allowed, approval required 40 days Requirements โ†’
Nigeria NCC Allowed, approval required 30 days Requirements โ†’
Rwanda RURA Allowed, approval required 5 days and 10 days Requirements โ†’
Sierra Leone NatCA Allowed, approval required Based on NatCA estimation Requirements โ†’
South Africa ICASA Allowed, approval required 30-45 days Requirements โ†’
Tanzania TCRA Allowed, approval required 14 working days Requirements โ†’
The Gambia PURA Allowed, approval required 2-4 weeks Requirements โ†’
Togo ARCEP Allowed, approval required Approximately 1-2 months Requirements โ†’
Uganda UCC Allowed, approval required Typically 5-6 weeks Requirements โ†’
Zambia ZICTA Allowed, approval required 5-15 days Requirements โ†’
Zimbabwe POTRAZ Allowed, approval required 4-8 weeks Requirements โ†’
Curaรงao RAC Allowed, approval required 3 to 10 weeks Requirements โ†’
Dominica NTRC Allowed, approval required 8 weeks Requirements โ†’
Honduras CONATEL Allowed, approval required 12 to 16 weeks Requirements โ†’
Jamaica SMA Allowed, approval required 15 working days Requirements โ†’
Panama ASEP Allowed, approval required 30 business days Requirements โ†’
Saint Kitts and Nevis NTRC Allowed, approval required 6-8 weeks Requirements โ†’
Saint Vincent and the Grenadines NTRC Allowed, approval required 5 to 8 weeks Requirements โ†’
The Bahamas URCA Allowed, approval required Typically 4-8 weeks Requirements โ†’
Trinidad and Tobago TATT Allowed, approval required 30 days Requirements โ†’
Hong Kong OFCA Allowed, approval required 15 working days Requirements โ†’
Japan MIC Allowed, approval required 3โ€“4 weeks Requirements โ†’
South Korea RRA Allowed, approval required About 8 weeks Requirements โ†’
Bahrain TRA Allowed, approval required 14 days Requirements โ†’
Iraq CMC Allowed, approval required 2 weeks Requirements โ†’
Kuwait CITRA Allowed, approval required 30 working days Requirements โ†’
Lebanon TRA Allowed, approval required 6 weeks Requirements โ†’
Oman TRA Allowed, approval required 7-10 days Requirements โ†’
Qatar ICT Allowed, approval required Simplified Type Approval: 5 days. Standard Type Approval: 15 days Requirements โ†’
Saudi Arabia CST Allowed, approval required About 2 weeks Requirements โ†’
Syria SY-TPRA Allowed, approval required 20 days Requirements โ†’
United Arab Emirates TDRA Allowed, approval required 3-5 working days Requirements โ†’
Yemen MTIT Allowed, approval required 4โ€“8 weeks Requirements โ†’
Bermuda RA Allowed, approval required 2-3 weeks Requirements โ†’
Canada ISED Allowed, approval required Typically 4-6 weeks Requirements โ†’
Mexico CRT Allowed, approval required NOM: 3-5 weeks. CRT: 20 business days. Requirements โ†’
Australia ACMA Allowed, approval required 5 business days Requirements โ†’
Fiji TAF Allowed, approval required 10 working days Requirements โ†’
Kiribati CCK Allowed, approval required 7 days Requirements โ†’
Nauru NCA Allowed, approval required Not publicly specified by the NCA Requirements โ†’
New Zealand RSM Allowed, approval required 2 weeks Requirements โ†’
Papua New Guinea NICTA Allowed, approval required 10 days Requirements โ†’
Samoa OOTR Allowed, approval required 30 days Requirements โ†’
Tonga CCT Allowed, approval required 5 days Requirements โ†’
Vanuatu TRBR Allowed, approval required 30 days Requirements โ†’
Argentina ENACOM Allowed, approval required 12-14 weeks Requirements โ†’
Bolivia ATT Allowed, approval required 5 working days Requirements โ†’
Brazil ANATEL Allowed, approval required 8โ€“12 weeks Requirements โ†’
Colombia CRC Allowed, approval required 3-4 weeks Requirements โ†’
Ecuador ARCOTEL Allowed, approval required 16 working days Requirements โ†’
Guyana Telecommunications Agency Allowed, approval required 8 to 10 weeks Requirements โ†’
Paraguay CONATEL Allowed, approval required 12 to 16 weeks Requirements โ†’
Peru MTC Allowed, approval required 8 to 14 weeks Requirements โ†’
Afghanistan ATRA Allowed, approval required 30 days Requirements โ†’
India WPC ETA and TEC MTCTE Allowed, approval required WPC ETA certification is around 1 to 2 weeks. TEC MTCTE certification takes around 8-12 weeks Requirements โ†’
Nepal NTA Allowed, approval required 4 weeks Requirements โ†’
Sri Lanka TRCSL Allowed, approval required 30 days Requirements โ†’
Brunei AITI Allowed, approval required 2 weeks Requirements โ†’
Cambodia TRC Allowed, approval required 15 working days Requirements โ†’
Indonesia DJID Allowed, approval required Local Testing around 5 weeks and Paperwork is about 3-5 week. Requirements โ†’
Laos MTC Allowed, approval required Paperwork: 10 working days. Local Testing: Take several additional weeks Requirements โ†’
Malaysia SIRIM Allowed, approval required Paperwork about 2weeks. Local testing approximately 4 to 6 weeks. Requirements โ†’
Philippines NTC Allowed, approval required 20-25 business days Requirements โ†’
Singapore IMDA Allowed, approval required 3 days (M2M: 2โ€“3 months) Requirements โ†’
Thailand NBTC Allowed, approval required 4โ€“8 weeks Requirements โ†’
Vietnam MoST Allowed, approval required 5โ€“6 weeks Requirements โ†’

Technologies in this group

  • LoRa / LoRaWANLong-range, low-power radio (LoRa) and its network protocol (LoRaWAN), in bands that differ by region. Allowed with type approval in every country in the Narmadi registry; India, for example, requires ETA for LoRa devices.
  • SigfoxA low-power wide-area network for small, infrequent IoT messages. Allowed with type approval in every country in the Narmadi registry.